Home
About
Businesses
Showcase
Honor
Blog
Recruitment
Contact
Series Classification
Structural steel detailing/fabrication drawing design
Steel Structure Node Design
Structure and Optimized Design
Structural design of small and medium-sized buildings
Auxiliary structural design for large buildings
Optimized design of steel structures
Calculation of steel structure lifting
Main push product
Norgener FGD and Fabric Filter
More details
TanjungBin Power Plant, Malaysia
Cameron LNG Liquefaction Project
Flower Town pedestrian bridge was completed on December 30, 2018 for traffic. With a total length of 102.5 meters, the main bridge is 6.3 meters wide, the stairway is 3.3 meters wide, and there is a 0.6-meter wide bike lane in the stairway. It connects Holland Flower Town and Zhongshan Park, providing convenience for people traveling to and from the park, and has become a beautiful landscape on Shennan Avenue.