Home
About
Businesses
Showcase
Honor
Blog
Recruitment
Contact
Series Classification
Structural steel detailing/fabrication drawing design
Steel Structure Node Design
Structure and Optimized Design
Structural design of small and medium-sized buildings
Auxiliary structural design for large buildings
Optimized design of steel structures
Calculation of steel structure lifting
Main push product
Norgener FGD and Fabric Filter
More details
TanjungBin Power Plant, Malaysia
Cameron LNG Liquefaction Project
Taipei Dome is a multi-purpose stadium located in downtown Taipei. The complexity of the project lies in the fact that in addition to the stadium, it also includes a number of commercial facilities such as shopping centers, cinemas, hotels and office areas. The total steel consumption is about 20,000 tons. Dunson was undertaken in 2013 and was responsible for the detailing of the main roof, which is the most complex part of the project, weighing about 11,000 tons.